Grey water Recycling System Design and Economical Analysis for Residences in Kariapatti Village
UNNAT BHARAT ABHIYAN Scheme Under SEG,
13.09.2023
Our proposal got approved by SEG for funding through UBA. The project title is ”Greywater Recycling System Design and Economic Analysis for Residences in Kariapatti Village”. 3 faculty coordinators and 8 student coordinators are involved in this project. Based on the common survey, we have selected Kariapatti village to implement this project. Also we need to conduct project based household survey, to identify the specific village location which is suitable for our project. In this regard, it is mandatory to get permission from the local governance.
So, the faculty and student coordinators visited Tahsildar, Tahsildar office, Kariapatti, on 13.05.2022. The faculty coordinators explained in detail about the importance of the project and the implementation process to be carried out with the help of Tahsildar. With more concern, Tahsildar has readily accepted for the implementation in the needed villages.
We submitted a requisition letter to Tahsildar regarding visit and to take survey in that village on 17.05.2022. Tahsildar directed the letter to Senior Revenue Inspector. We briefed about our project to him. He gave permission to visit & take survey in Kariapatti area on 04.08.2022.
We visited Tahsildar office on 04.08.2022 at 11 am. Kariapatti area VAO and Thalaiaari bot accompanied with us to guide the area and helped us to interact with people in that area. We visite 3 streets in Anna nagar Kariaptti.
Our Survey detailed as follows.
We have visited 4 places (2 compound, one individual house and lake near sevalpatti.)
Observation
Implementation:
People are not cooperative for implementation of any new device at their home. After explaining about the project and benefit one resident in that kariapatti area ready to implement the project in their home with a condition of not too much alternation in the existing construction.
Inspection was done on 11.03.2023
Initially the project was implemented in one resident in the area. After the feedback received from the beneficiary, an awareness program will be conducted to the area people to implement the project in their residence.
Milestone Achieved:
Milestone Achieved: |
PERIOD |
STATUS |
Milestone Achieved: |
August to October |
Completed |
Milestone Achieved: |
November |
Completed |
Milestone Achieved: |
March |
Completed |